What Is TheTtypical Implementation Timeline For MAGNETO In Factory Environments?


The go-live timeline for MAGNETO AI APS depends on the factory’s digital maturity level, integration scope, and production complexity.
However, the general implementation process typically follows these stages:

1️⃣ Preparation & Analysis Phase (2–4 Weeks)
Current systems (ERP, MES, Excel, or manual processes) are analyzed, data structures are reviewed, and a detailed project plan is created.

2️⃣ Integration & Modeling Phase (4–8 Weeks)
Factory production processes are adapted to the MAGNETO model, ERP/MES connections are established, and data flow is tested.

3️⃣ Pilot & Optimization Phase (2–4 Weeks)
A pilot run is conducted on a selected production line or product family to validate system accuracy and performance.

4️⃣ Go-Live (Total 8–12 Weeks)
All lines are integrated, user training is completed, and MAGNETO begins managing real production schedules.

Result:
MAGNETO AI APS typically goes live within 2 to 3 months.
In highly digitally mature factories, this period can be reduced to as little as 4–6 weeks.